Quick answer: Add up the real wattage of everything the UPS will power, add 20–25% headroom, and choose a UPS whose watt rating (not just its VA rating) covers that total. Then confirm it gives you enough battery runtime at that load and that its input plug matches the outlet or circuit you have.

In this article

Quick facts

VA vs watts VA is apparent power; watts is the real power your equipment draws. The watt rating is usually the limit you hit first.
Target load Plan for 75–80% of the UPS’s watt rating or less.
Runtime Runtime falls quickly as load rises. Check the runtime chart for the exact model.
Need more runtime? Choose an extended-run (XL) model and add external battery modules (EBMs), or step up one size.
120 V plugs (NEMA) Up to about 1500 VA: 5-15P. Around 2000–3000 VA: often 5-20P or L5-30P, which need a 20 A or 30 A circuit.
208 V plugs L6-20P or L6-30P are common; larger units may be hardwired.
600 V Rack UPS units don’t run on it directly. You’ll need a step-down transformer or a 3-phase UPS.
Certification In Canada, look for CSA or cUL marking.

What’s the difference between VA and watts?

VA (volt-amperes) is voltage times current. Watts is the power your equipment actually uses. The ratio between the two is the power factor. Modern server power supplies run close to 1.0, so their watts and VA are nearly equal. That’s why a UPS’s watt rating, which is often 0.9 × its VA or lower, is usually the limit you reach first.

How do I size a UPS? (4 steps)

  1. List every device and its real power draw. Use measured watts from a metered PDU or the server’s management interface where you can. Nameplate figures are maximums and overstate the load.
  2. Add it up and add headroom. Total the watts, then multiply by 1.25. That covers growth, start-up inrush and battery aging.
  3. Choose the UPS by watts, then check VA. Pick a unit whose watt rating is at or above your total with headroom.
  4. Check runtime, topology and plug.
    • Runtime: do you need five minutes to shut down cleanly, or 30+ minutes to ride out an outage?
    • Topology: line-interactive suits most closets; online double-conversion suits critical loads, unstable power or generator-backed sites.
    • Plug: the input plug has to match a circuit you actually have.

Worked example: a small server rack

Device Qty Watts each Total
1U server 2 350 W 700 W
48-port PoE switch (light PoE load) 1 120 W 120 W
Firewall 1 40 W 40 W
NAS 1 80 W 80 W
Total load 940 W

With 25% headroom: 940 W × 1.25 ≈ 1,175 W

How much runtime do I need?

  • Clean shutdown only (5–10 minutes): the smallest UPS that covers the load is usually enough. Configure shutdown software through USB or a network card.
  • Ride-through until a generator starts (1–2 minutes plus margin): use an online double-conversion UPS for clean power during the transfer.
  • Riding out short outages (15–60+ minutes): use an extended-run model with EBMs, or a larger UPS running at low load.

When a bigger UPS isn’t the answer

  • Your circuit can’t support it. A 3000 VA, 120 V unit needs a 30 A circuit. If you only have 15 A outlets, split the load across two smaller units instead.
  • You need hours of runtime. Batteries get expensive and heavy, and a generator is the right tool for that.
  • The problem is bad power, not outages. Frequent sags, surges or generator power call for online double-conversion. A bigger line-interactive unit won’t fix it.

Common UPS sizing mistakes

  • Sizing by VA alone and overloading the watt rating.
  • Using nameplate wattage, which oversizes the UPS, or ignoring PoE load on switches, which undersizes it.
  • Running the UPS at 95–100% load, which leaves almost no runtime and no room for growth.
  • Forgetting the input plug and circuit (L5-30, L6-30) until installation day.
  • Plugging laser printers or space heaters into the UPS.
  • Never replacing batteries. Battery capacity drops with age, typically over 3–5 years.

What the standards say (Canada)

  • CSA C22.2 No. 107.3 / UL 1778 cover UPS safety. Look for a CSA or cUL mark on units installed in Canada.
  • CSA C22.1 (Canadian Electrical Code) governs the circuits and receptacles a UPS plugs into.
  • NEMA WD 6 defines plug and receptacle shapes such as 5-15, L5-30 and L6-30.
  • IEC 62040-3 defines UPS topologies (VFI = online double-conversion, VI = line-interactive).

FAQs

Should I size a UPS by VA or watts?

By watts. On most modern UPS units the watt rating is the limit you reach first. Use VA only as a secondary check.

How much headroom should I leave?

Run the UPS at no more than 75–80% of its watt rating.

How do I get more runtime?

Choose a larger UPS so it runs at a lower load, or use an extended-run model with external battery modules. Always check the model’s runtime chart.

What if my building has 208 V or 600 V power?

208 V is common in Canadian data rooms, and many rack units use L6-20 or L6-30 plugs for it. 600 V needs a step-down transformer or a 3-phase UPS, so contact us with your panel details.

Do I need CSA or cUL certification in Canada?

Look for a CSA or cUL mark on any UPS installed in Canada. It’s often required by inspectors and insurers.

Can Solid Stax help me size a larger or 3-phase system?

Yes. Send us your equipment list or a load reading through our contact page, and we’ll recommend a unit and confirm lead time.

Next steps

What to read next: Line-interactive vs online double-conversion UPS: which power problems each one covers (coming next week).

Published by Solid Stax Inc., Kitchener, Ontario.